The trajectory
Pre-ATO today. On track for H2 2026.
The compliance posture is sequenced with the Tradewinds OTA timeline. FedRAMP Moderate, CMMC 2.0 Level 2, and ATO inheritance via Second Front Systems' Game Warden, in that order.
01 / 02
The sequence
Each milestone has a date and a dependency.
No milestone is claimed before it is earned. The status on every row is honest as of today: pre-ATO now, the FedRAMP and CMMC work on track for H2 2026, the operational milestones projected against the Game Warden inheritance path.
-
TODAYAs of June 2026
Pre-ATO
Current stateHypha runs in the air-gap-capable envelope. The compliance work is sequenced around the OTA opportunity, not vice versa.
-
H2 2026Target window
FedRAMP Moderate
On trackDEPENDENCY: Game Warden inheritance
-
H2 2026Target window
CMMC 2.0 Level 2
On trackDEPENDENCY: Game Warden inheritance
-
SEP 2026Projected
ATO via Game Warden inheritance path
ProjectedDEPENDENCY: FedRAMP and CMMC complete
-
DEC 2026Projected
Sustained mission operations with a Department of War customer
Projected · TRL 9DEPENDENCY: ATO granted
The path is inherited, not rebuilt. FedRAMP Moderate, CMMC 2.0 Level 2, and the ATO are reached through Second Front Systems' Game Warden, which carries the accreditation envelope so Hypha does not re-litigate controls already authorized.
02 / 02
The controls
The controls that matter, written down.
Four controls hold the line while the accreditation work runs. They are in force today, not on the roadmap.
-
CTL-01
Air-gap capable
No commercial cloud LLM. No API key. No network egress at runtime. The runtime is the room.
-
CTL-02
Auditable provenance
Every output cites the data and the model card that produced it.
-
CTL-03
JWT-gated authentication
Admin and operator surfaces both gated. CORS allowlist enforced.
-
CTL-04
Honest evaluation in the UI
The platform refuses to deploy models that fail the holdout. The verdict is visible to the operator.